BauderVIP INV Inverted Roof Insulation

Approved Contractor Version

  • This training guide has been put together in order to highlight some key points to consider when preparing for an installation which contains BauderVIP INV.
  • We encourage you and your operatives to read the following advice for dealing with BauderVIP INV as a stand-alone product or incorporated within an inverted roofing system. If you have questions, a list of contacts is given at the end of this guidance document.

Preventative measures

  • Use a dustpan and brush and / or vacuum cleaner to clean the area.
  • A change of footwear or felt shoe covers should be used between clean and dirty areas to avoid debris transfer.
  • Kneel / crawl / spreader boards (XPS or EPS insulation for example) should be used. Direct foot traffic over BauderVIP INV panels should be avoided until protection layers / final finish has been installed.
  • ‘No Entry’ barriers or stickers (to prevent access) should be used.

Preparation

  • Scheduling of works is encouraged. Plan the full procedure including follow-on trades. Follow-on trades can be unaware that VIPs need be treated in a certain way. Follow on trades especially (due to lack of product awareness) can undo all the hard work unintentionally, therefore compromising the panels without even knowing it.
  • Cleaning / preparing the substrate in readiness for the install is crucial. Debris transfer can be damaging.
  • Careful storage and handling is key. Keep the BauderVIP INV panels in the boxes until the last possible minute before install. Protection is paramount - ensure BauderXPS (300) and BauderXPS WFRL overlays have been ordered. See project detailed specification for further information.
  • Site or application access must be stringent, ideally restricted to trained personnel only. Therefore, segregate off the area until the protection layers have been installed, both underlay and overlay. It is preferable to keep the area segregated until the final finish has been installed. Use ‘No Entry’ stickers / signs until application is fit for purpose / access.
  • Box dimensions are 1220 x 605 x 255 mm and should be stacked no more than five boxes high.
  • Two people should lift one box at a time.
  • Store the materials outdoors with suitable robust UV resistant, flame-retardant tarpaulin. Ensure the product(s) are clear of buildings and any other storage areas. The products must not be exposed to a direct naked flame or other ignition sources, or to solvents or other chemicals. All insulation boards must be kept dry, on pallets and off the ground. The packaging of Bauder Insulation products should not be considered adequate for weather protection. Where there are storage containers on site, these may be suitable for storing products.
  • Once the seal / boxes have been opened Bauder Ltd will not be held liable for any panel replacement charges.
  • Friable material should be removed from the substrate which should then be swept to remove dust and debris. Levelling compounds may be required to take up any undulations and remove any protrusions. The compound should be allowed to set / dry. Leftover debris should be removed and the substrate cleaned prior to laying the underlay protection layer in readiness for the BauderVIP INV panels to follow.

Installation

  • BauderVIP INV panels and infill panels should be loose laid with BauderXPS (300) loose laid over them, followed by BauderXPS WFRL which is finished with paving slab, gravel ballast (min 80kg/m²) or other specified surfacing.
  • Install the surfacing layer as soon as possible, to ensure that BauderXPS WFRL is always protected, and excessive heat build-up or high winds do not damage the insulation panels.

– Gravel ballast should be washed, rounded, nominal 20-40 mm diameter, and of minimum depth 50 mm.

– If using paving slab ballast, minimum 50 mm thick, this should be laid over the BauderXPS WFRL on proprietary paving slab supports of minimum 175 mm (or equivalent base area), to maintain drainage below the slabs, and to ensure that moisture vapour can escape.

– See Bauder Specification for alternative surfacing requirements.

  • Do not cut BauderVIP INV.
  • Do not perforate panels, i.e. do not use mechanical fixings (screws, nails, anchor bolts, etc.) to attach BauderVIP INV. Loose lay only.
  • Do not drop panels or leave temporarily on unprotected areas prior to install (keep them in their box until the moment of installation).
  • A Handling Advice sheet is within every box of BauderVIP INV which re-emphasises all the above points.

Technical Advice

Build your team’s knowledge of the BauderVIP INV inverted roof system with on-site familiarisation and support from one of our Site Technicians.

Once the site visit has been completed, you will be supplied with a full summary report of the visit with any comments and further recommendations, providing you with the peace of mind that the installation is compliant with the latest regulations and advice.

Additional information can be gained from:

[email protected]

Product Manager – Hot Melt

Project Assigned Bauder Site Technician