Assembly

6.1 Levelling and alignment of base rails

  • The roof should be clean of debris and coarse materials.
  • Mark out the installation grid on the roof surface/protection layer using a chalk line and measure the distances to roof edges or existing roof installations.
  • Align and measure out the base rails according to the project specific Bauder dimensioned roof layout.

6.1.1

Screenshot 2026-11-16 143209

6.2 Laying the Bauder DSE 40 anchor board

  • Refer to the Bauder dimensioned layout to establish in which orientation the anchor boards should be installed.
  • Install DSE40 anchor boards over base rails (1) with holes centered over the base rails.
  • If required, close any remaining gaps with the unperforated DSE40 boards (2).
  • The pre-cored holes cut into the DSE40 anchor board are not centred. The short V-beam will later be installed in the perforation located 39cm from the board edge. The long V-beam is 59 cm from the board edge.

6.2.1

6.2.2

6.3 Installing the DSE 40 green roof drainage boards between the DSE 40 anchor boards

  • Where required, install DSE40 green roof boards (2) between DSE40 anchor boards.
  • DSE40 drainage boards should be installed into gaps between DSE40 anchor boards to ensure entire green roof area is covered with drainage boards.
  • DSE40 drainage boards to be butted against each other, not overlapped.

6.3.2

6.4 Installing BauderGREEN FV 125 100 filter fleece

  • Roll out BauderGREEN FV 125 100 filter fleece over entire roof area that will be covered with substrate lapping the BauderGREEN FV 125 100 Filter Fleece by 150mm on all joints.
  • Ballast the BauderGREEN FV 125 100 Filter Fleece to prevent it lifting. This can be achieved using substrate bags or BauderSOLAR VT V-beams.
  • Cut BauderGREEN FV 125 100 Filter fleece above BauderSOLAR DSE40 Anchor Board perforations.

6.4.1

6.4.2

6.4.3

6.5 Install V-beams into base rails

  • Guide VT 545 (short V-beam) and VT 745 (long V-beam) ③ alternately through the openings of the Bauder DSE 40 anchor boards with perforation ④ sideways into the opposite elongated holes of the base rails ⑤.
  • Tighten with the support screw until you reach final suspension point ⑥.
⚠️ Warning
TIP!

The pre-cored holes cut into the DSE40 anchor board are not centred. The short V-beam should be installed in the perforation located 39cm from the board edge (a). The long V-beam (b) is installed onto the perforation located 59cm from the board edge.

6.5.1

6.5.2

6.5.3

6.6 Mounting of the MTR module mounting rail and the DLE diagonal support

  • Fasten the BauderSOLAR DLE diagonal support  to reinforce the supporting structure to the BauderSOLAR VTE 545/745 short and long V-beams with BauderSOLAR SSR button-head screws, and nuts through the overlapping elongated holes .
  • BauderSOLAR DLE diagonal support fixing to be connected to VTE 545 (short V-beam) 4 or 5 No. eyelets from base bracket.
  • BauderSOLAR DLE is then connected to VTE 745 in the second eyelet from the top .
  • DLE connection to 745 V-Beam should be hand tightened to allow for adjustment of MTR rail during module installation. Once module is secure, fixing to be tightened to 35Nm.
  • Fasten the MTR module mounting rail  to the VTE 545/745 V-beams through the overlapping elongated holes with BauderSOLAR SSR 30 button-head screws, and nuts .

• Long v-beam separation (A) = 6 slotted holes on module rail

• Short v-beam separation (B) = 4 slotted holes on module rail

  • Tightening torque 35 Nm.
  • BauderSOLAR MTR Module carrier rails should be installed to ensure as little wastage as possible.
  • Lengths of MTR module mounting rail shorter than 1m should be discarded or used as rail connectors.

6.1.2


6.7 Example BauderSOLAR MTR module carrier rail installation process

To calculate the length of MTR module mounting rail required, the following calculation can be applied:

(Module width + 20mm clamp) x module in row + 200mm

For example, in the image above, a row of 9 modules with a width of 1134mm would be calculated as follows:

1134 + 20 = 1154mm

1154 x 9 = 10.21m

10.21m + 200mm = 10.41m

6.7.2

⚠️ TIP!
The project specific Bauder dimensioned drawing will provide calculations for all required rail lengths.

The maximum allowable overhang of module from final fixing of V-angle is 650mm.

6.7.3

6.8 Install rail connectors for module carriers

  • For longer module rows, the BauderSOLAR MTR module carrier rails must be connected to each other via a module rail connector (n).
  • For this purpose, BauderSOLAR MTRV module rail connectors (m) should be used.
  • The BauderSOLAR G LIGHT MTRV connect 2 BauderSOLAR MTR carrier rails connected using 4No. BauderSOLAR SSR button head screws (O).
  • Tightening torque 35 Nm.

Screenshot 2026-11-16 143617

6.9 Installing BauderGREEN substrate above the BauderGREEN FV 125 100 filter fleece

  • Attach BauderSOLAR EK-L & EK-R protective caps  to the ends of the MTR module mounting rail.
  • Apply the substrate  evenly over the Bauder DSE 40 anchor/drainage boards at the appropriate depth according to the project-specific static ballast calculation.
⚠️ Warning
Wind uplift and ballast requirements

Refer to the BauderSOLAR G LIGHT ballast layout for confirmation of requirements as the volume/depth of substrate per unit area is project specific and will vary between different wind load zones.

6.9.1

6.10 Fastening of solar modules with MKL and EKL module clamp set

  • Fasten the solar modules  centred above the BauderSOLAR MTR module mounting rail, using BauderSOLAR MKL (mid) and BauderSOLAR EKL (End) module clamp set with BauderSOLAR EKL end clamps  and BauderSOLAR MKL middle clamps as appropriate.
  • Guide the notch on the clamping hook in the BauderSOLAR MTR module mounting rail and tighten the module clamp using the screw connector.
⚠️ Warning
Tightening torque of module clamps

When installing the module clamps, the tightening torque specified by the manufacturer of the solar modules should be followed.

Please follow manufacturer guidance for module installation.

6.10.1

6.10.2

6.11 Applying BauderGREEN Flora 3 seed mix

  • Ensure the substrate is at the correct level and is raked out to give a smooth finish.
  • Water the substrate thoroughly prior to spreading the Seed Mix.
  • Seed in two passes at 90º to each other, sow 50% of the mix in each direction to achieve sow rate of 100g/m².
  • Do not water or rake afterwards.
  • Do not traffic or disturb the seeded area otherwise germination of the seed will be affected.

For further information on BauderGREEN Flora 3 seed mix installation and establishment please see our Bauder Green Roof Installation Guide.