Assembly and Installation

3.1 Required tools

■□ Chalk line - red chalk provides best visibility on most roofing membranes.

■□ Tape measure

■□ Pen, chalk, markers

■□ Try-square 90° tool (carpenter’s square)

■□ Cable ties

Hot Works - for fixing welding sleeves

  • Gas torch (for bituminous systems).
  • Hot air gun (for single ply systems).
  • Associated fixing tools (such as pressure rollers).

3.2 Preparatory measures

Remove coarse dirt and loose debris from the roof surface. Surfaces must be dry and free from adhesion-reducing substances.

3.3 Marking out the grid layout

  1. Locate reference/start point ① (corner of array) using Bauder dimensioned roof layout.
  2. Using a tape measure, mark out reference points ② for a string line for either of the axes.
  3. Mark off with chalk line.
  4. The outer edge of the reference point on the marked lines, ③ extending them the length of the array. Follow the same procedure on the alternative axis.
  5. Mark centre distances of the fixed row width of 1450 mm on the first outer edge. ④ (Initially, mark only 2 - 3 grid lines, having first checked that the grid is secure.)
  6. Mark the axial separation within the module rows on the second outer edge according to the project-specific installation plan ⑤ (initially, mark only 2 - 3 grid lines here as well).
  7. Using the 3 - 4 - 5 rule, or a carpenter’s square, ensure that the first 2 datum lines are square.
  8. Measure out the rest of the grid using the 2 grid dimensions. The intersection points of the layout grid are now set up.

It is possible to measure the diagonals of the resulting rectangles. If these are the same length, the marking out has been correctly calibrated at right angles.

  1. Follow steps 1-6 to mark off the extended outer edges of the entire module field.
  2. Check distances to existing roof structures according to Bauder roof layout.
⚠️ Warning
Achieving an accurate grid layout

The intersections of the system axes for the roof fastenings (base plates with welding sleeves) have to be precisely measured and executed with extended lines (chalk line) in order to be able to position, align, and fasten the welding sleeves with their slotted sides at the correct location. Check that this is done accurately before proceeding to the next step.

3.3.1

3.4 Positioning the welding sleeves

  1. Place welding sleeve over baseplate. 
    3.4.1
  2. Using notched sides of the welding sleeve, locate the welding sleeve and baseplate over string line as shown.
    3.4.2
  3. Repeat throughout grid, referring to the project array plan.
    3.4.3

Refer to project array plan as per project specification.

3.5 Welding the sleeves

  1. For bituminous systems, use a gas torch to weld the sleeve membrane-to-membrane and ensure a bitumen bead is visible around the perimeter.
  2. For single ply applications, use a hot air gun to create a standard 30 mm weld around all perimeters.
    3.5.1
⚠️ Warning
PLEASE NOTE

For BauderSOLAR MST-PVC installations, the welding sleeve should be installed with anthracite side upwards. If there is any confusion, please check that the underside of the sleeve matches the underside of the field membrane (underside of selvedge for fleece-backed membrane).

3.6 Installation of the mounting units

  1. Position the eyelet openings of the mounting unit ① above the appropriate locators of the baseplate ②.
    3.6.1
  2. Insert bayonet fittings ③ through the eyelet openings of the mounting unit ④ into the two sockets of the baseplate and lock into place by turning the bayonet clockwise 90°. ⑤
    3.6.23.6.33.6.4

A clicking sound in the closure can be heard when the handle of the bayonet is in position.

  1. A bayonet locking pin ⑥ secures the bayonet cap in place as per image.
    3.6.5
  2. Repeat until all mounting units are secured.

3.7 Installing the photovoltaic modules

  1. Standing behind the mounting units, place the module on the abutment surface on the lower edge of the mounting unit ①.
    3.7.2
  2. The module should sit inside the vertical raised profile ②.
    3.7.3

The raised profiles on the contact surfaces ① serve as positioning aids and facilitate alignment of the photovoltaic module on two mounting units.

  1. Rotate the module downwards on the contact surface (pivot point) until it is close to the mounting unit angle of 12° ③ and pull the module horizontally backwards so that the frame return engages the sprung fixing hook.
    3.7.5

Then pull the module frame at the upper edge ④ so that the spring mechanism pulls the frame into place on the upper hooks/clamps.
3.7.6

⚠️ Warning
Risk of breakage to the module frame when rotating

It is important to not rotate the module vertically when the hook has been engaged ①. There is a risk that the bar of the module frame will be permanently bent or that the clamping hook will break off.

3.7 Installing the photovoltaic modules continued...

  1. The module should now be locked into place on all four clamps. Ensure this is the case before moving on to the next step.
  2. When selecting which openings on the clamp to use, select the opening closest to the module whilst ensuring a minimum gap to the module frame of 2 mm.
  3. Insert locking pins ⑥ with the two snap hooks into the corresponding openings of the upper fixed clamps ⑤.
    3.7.7
  4. Push in far enough that the hooks click audibly into place.
  5. Insert locking pins with the two snap hooks into the corresponding openings of the lower flexible clamps.
  6. Push in far enough that the hooks click audibly into place.

Repeat assembly steps 1 to 9 for each photovoltaic module until the entire array is installed securely.

⚠️ Warning
Correct position of the locking pin

When installing the locking pins it is important to note that the shortest possible distance to the module frame should always be selected. However, there must still be a gap of at least 2 mm between the frame and the locking pin to compensate for thermal expansion of the module.

The locking pin must, under no circumstances, be subjected to pressure from the module frame either during installation or when installed.

Example of south-facing orientation.

3.7.9

The BauderSOLAR PV array can also be installed in an east-west-facing orientation, for further information, please contact our technical department.

3.7.10

3.8 Cable management

For the module wiring (DC side), the norms and legal requirements as well as the individual specifications of the module manufacturer apply (see page 2 of Standards and Regulations).

Cable tie holders are available as a cable-mounting option on the side of the mounting units and should be utilised for north/south cable runs.

Cable tie holders: position and orientation of the cable tie holders on the main structure and dimensions of a cable tie holder.

3.8.2

The BauderSOLAR flat roof mounting system consists of polypropylene and polyamide as well as single ply or bitumen welding seals that are not conductive and are therefore not to be put in protective earthing, or protective or functional equipotential bonding.

⚠️ Warning
Manufacturer’s instructions for cable laying

The cable containment method must match the module manufacturer’s specifications.

Please see project-specific final technical report for cable layouts and string diagrams.

Cable laying above the water-bearing layer

Solar cables with connectors and equipotential bonding cables must not rest on the waterproofing layer and care must be taken to ensure they are contained/fixed correctly.