Planning the Installation
2.1 Installation conditions
On-site checklist:
■□ Roof type:
Flat roofs of existing buildings or new construction with approved Bauder bitumen or single ply membranes.
■□ Roof pitch:
Up to a maximum of 5° for bitumen membrane systems and up to a maximum of 10° for single ply membrane systems.
■□ Residual load-bearing capacity of roof:
9-12.5 kg/m² depending on the type of photovoltaic module used. Note that certain weather conditions (wind/snow load), significantly higher loads and lifting forces than the rated weight can occur. The stability of the roof must be checked by a static calculation (Euro Code 1 (BS EN 1991-1-3 and BS EN 1991-1-4 with national annexes).
■□ Structural analysis:
Demonstration of the stability of the building construction (structural engineering) in conjunction with the photovoltaic system to be constructed. For existing buildings, additional load will be placed on the structure and a structural engineer should be consulted and their recommendations followed.
■□ Roof deflection:
Differences of no more than 20 mm are permitted for on-site tolerances of the roof finish. Where changes in level or tapered insulation schemes are present, a maximum permitted variation of 20 mm is allowable.
■□ Roof insulation:
Compressive strength of the insulation >120 kPa according to BS EN 12430
■□ Roof height:
See project-specific wind uplift calculations for confirmation of stability.
■□ Roof membranes:
The condition of the waterproofing system must be confirmed before installing the PV array.
• Bitumen
The waterproofing layer must be suitable for welding and be approved by Bauder. Age not exceeding 10 years, with a minimum level of quality from Bauderflex upwards.
In the case of bitumen membranes that are older than 10 years or have visible defects, a site inspection by a Bauder representative must be carried out (quality level from Bauderflex upwards).
• Single ply
The Bauder single ply must be suitable for welding, be secure against wind uplift and be approved by Bauder.
Not older than 4 years (quality level BauderTHERMOPLAN T 1.5 mm or thicker; BauderTHERMOFOL 1.5 mm or thicker). If the membranes are older than 4 years, the approval may be given by a Bauder representative following a site survey to confirm suitability.
2.2 PV Module Parameter checklist
| On-site checklist | Minimum | Maximum |
|---|---|---|
| Module length | - | ca. 2000 mm |
| Internal frame (B-B) BauderSOLAR F | 915 mm | 984 mm |
| Internal frame (B-B) BauderSOLAR F XL | 979 mm | 1080 mm |
| Internal flange width (C-C) | 10 mm | - |
| External flange width (D-D) | 12 mm | 35 mm |
| Module depth (E-E) | 25 mm | - |

2.3 Setting out the scheme
Refer to the Bauder specification and roof plan layout prior to setting out the scheme.
To install the BauderSOLAR flat roof mounting system, the layout of the baseplate grid must first be calculated.


Grid row spacing
Fixed row spacing, as detailed on project specification, and crossing points with the roof fastenings (baseplate with welding sleeves).
The axial distance of the module rows (as illustrated below) is calculated using the module manufacturer’s specified separation distance between the photovoltaic modules and the length of the module (external dimension).
In order to achieve a secure seating of the module frames on the mounting structure, the separation distance must not exceed 20 mm.
Instructions for setting the array
- Row spacing = as detailed on project specification.
- Axial distance = ½ separation distance + module length + ½ separation distance.
- Separation distance of modules (max) = 20 mm.
- Distances to roof structures (minimum) = 500 mm.
- Distances to the roof edges (minimum) = 1 m.
- Distances to lightning protection equipment = please contact a lightning conductor specialist for a project specific calculation.