Inverted Insulation Installation
Manual Sections
EPS/XPS Inverted Insulation Installation
Bauder offers a wide range of insulations for use in inverted roof situations. These include:
Inverted Insulation
- Bauder JFRI PREMIUM (expanded) EPS polystyrene insulation
- Bauder JFRI Upstand Insulation
- Bauder WFRL (Water Flow Reduction Layer)
- Bauder XPS (extruded) XPS polystyrene insulation
- Bauder XPS Upstand Insulation
- Bauder XPS WFRL (Water Flow Reduction Layer)
- BauderGLAS Inverted Insulation Cellular Glass (Non-Combustible)
- BauderGLAS Upstand Insulation (Non-Combustible)
- BauderROCK NC 56mm Upstand Insulation Mineral Wool (Non-Combustible)
In principle, installation of Polystyrene Inverted Insulation follows the same principle for both EPS and XPS variants, however there are a few variations with the installation of Cellular Glass as can be seen below:
Inverted Polystyrene Insulation
Field Area
- Inspect/Test and repair the installed waterproofing prior to any insulation being laid.
- Inspect the waterproofing to ensure that it is clean and ready to accept the Inverted Insulation installation.
- Plan the Inverted Insulation installation to reduce the amount of cuts, holes etc and to maintain board security via rebated edges.
- A separation layer is not required when using EPS/XPS/Cellular Glass Inverted Insulation on Hot Melt Systems.
- Bauder Inverted Polystyrene Roof Insulation is installed loose laid over the weatherproofing, ensuring all rebated joints are tightly butted together.
- Cut boards with a sharp saw or hot knife.
- Boards are laid in a staggered pattern starting from the point of access to the roof, when using a second layer stagger joints of insulation from first layer.
- Only install amount of Bauder Inverted Polystyrene Roof Insulation that can be ballasted, paved or green roof installed in the same day.
- Bauder Inverted Polystyrene Roof Insulation should always have a Bauder JFRI WFRL Membrane loose laid to its upper surface.
- Bauder WFRL Membrane is loose laid over the insulation running across the fall of the roof with 300mm overlaps.
- The membrane is turned up at all roof penetrations and upstands to a height to ensure it finishes above the level of the ballast or paving.
- At drainage outlets neatly cut and turn down the filter layer to discharge water at the outlet positions.
- Lay paving slabs on supports around roof perimeters as required.
Ballasting
Lay the ballast layer progressively. Start work at point of access and progressively work in a forward direction so that all ballast material is carried across a protected waterproof layer.
Upstands
- Upstands can be finished using Bauder XPS Upstand Boards or BauderROCK NC 56mm Upstand Boards (fixing depends on height of upstand) to reduce the risk of cold bridging. Please refer to Bauder XPS Upstand Boards or BauderROCK NC 56mm Upstand Board Product Data Sheets for limitations of use and fixing requirements.
- The Bauder XPS Upstand Insulation Board is designed to be used with Bauder XPS and Bauder JFRI Inverted Roof Insulation.
- Bauder XPS Upstand Insulation is supplied as a 1200 x 600mm board and can be used either way up or cut to size as required.
- When installed, provided that the top surface is protected by an appropriate coping, cill or cover flashing, Bauder XPS Upstand Insulation is suitable for long term exposure – for example when used in conjunction with an inverted roof system.
- Generally, the upstand insulation should be installed first, so it can be wedged in position at the base by the boards subsequently applied to the flat areas.
- However, if there are two layers (multi layers) of insulation to the horizontal field areas, the bottom layer(s) of insulation can sit at deck level and the upstand board can be installed on top and then wedged into position using the uppermost layer (minimum thickness 100mm) of the insulation to the field area.
Low Level Installations - up to 150mm above the ballast
- Bauder XPS Upstand Boards require no additional restraint up to 150mm above the surfacing. Upstand Boards are pinned and restrained by the Bauder XPS (300) Inverted Insulation.
- Contact Bauder Technical or refer to Bauder J31 NBS project specific specification.
High Level Installations Mechanical Fixing – Installations exceeding 150mm above the ballast*,**
- Mechanical fixings should be stainless steel or galvanised steel with appropriate pressure plate washers (minimum 40mm diameter). Fixing type, material, grade, diameter, length, number and position etc. should be specified to suit substructure and site conditions. Alternatively, boards can be tightly clipped continuously on top edge with a minimum continuous cover depth of 75mm.
- Boards should be pre-drilled with over-sized holes relevant to fibre cement board, (at least 2mm oversize), to allow for expansion. Fixings should typically be positioned across the top edge of the board at maximum 300mm centres, minimum 40mm from the corners of the board and 40mm in from the top edge to avoid damage to the board finish.
- Additionally, one horizontal strip of suitable PU adhesive should be used at mid-point of the exposed board area if exposed area is greater than 750mm above the surfacing finish.
*Where appropriate, Upstand Board heights to be maximum of one board, longest length.
**Not an option for Approved Document B defined “Relevant Buildings”
Mechanical fixings are only allowed in the areas described in this document.

Cutting & Drilling
- When cutting and drilling Bauder XPS Upstand Insulation, it may be cut by hand or with an appropriate power tool.
- XPS insulation - when cutting by hand, it can easily be cut with a long-bladed knife or insulation saw available from DIY/Builders Merchant outlets. Please ensure the correct PPE is worn when using or cutting insulation.
- Fibre Cement particle topped boards - when cutting, use relevant power tools such as a disc cutter, jig saw or angle grinders using a diamond tipped blade. Please ensure the correct PPE is worn when using or cutting cement particle board.
- Holes required in fibre cement particle board should be drilled with standard masonry bits.
Health and Safety Information
- PPE should include safety goggles to protect against dust / projectile material, gloves to protect against possible sharp edges on the laminate board and a suitable dust mask to protect against dust inhalation. The mechanical effect of coarse fibres/fine dust particles in contact with throat, skin or eyes may cause temporary inconvenience.
- Bauder XPS Upstand Insulation is recyclable.
- Off-cuts need to be disposed via an authorised disposal contractor to an approved waste disposal site, observing all relevant regulations.
Please ensure all installation specifications meet any associated Building and Fire Regulation requirements.