System Installation
Manual Sections
Single layer
The waterproofing will already be installed as per the Bauder specifications and recommendations. BauderGLAS Inverted Insulation is loosely laid with staggered joints on a flat substrate.
After the insulation is laid, check it is fully supported upon the substrate with no rocking or movement. All insulation joints should be tightly butted together and tight against the abutments. If necessary remove and refit or replace any wrongly fitted insulation.
Walking over the BauderGLAS Inverted Insulation during installation is possible, but should be done with care. If required it’s important to use “walking boards” to reach the areas where you want to bring all other materials such as Bauder JFRI WFRL, pedestals and paving, etc.
Point loads upon the insulation surfaces are to be avoided, adequate preparations and care should be taken at all times.
It is recommended to install Bauder JFRI WFRL over the BauderGLAS Inverted Insulation at the end of the working day.
Where possible install the insulation, WFRL, and finishes such as pedestals and paving in one stage, gradually moving across the work area. This avoids the need for moving the protection boards around; and the finishes also protect the insulation system from damage by other trades.
Two or more layers
Base layer
The waterproofing will already be installed as per the Bauder specifications and recommendations.
Using the setting out plan previously described the BauderGLAS T3+ slabs are loosely laid with staggered joints on a flat substrate.
Fit the BauderGLAS T3+ slabs individually ensuring they are all fully supported upon the substrate with no rocking or movement.
If the base layer insulation is firmly supported upon the substrate, but there are slight differences in the top surface level, this surface can be carefully sanded flat.
Top layer
After the base layer is installed correctly you can start with the top layer of BauderGLAS Inverted Insulation
Following the setting out plan previously described lay the BauderGLAS Inverted Insulation in a staggered / offset pattern which is also offset from the insulation layer beneath. Joints in the top layer should not align with the base layer.
After the top layer of insulation has been laid, check it is fully supported upon the base layer with no rocking or movement.
All insulation joints should be close butted together and tight against the abutments. If necessary remove and refit or replace any wrongly fitted insulation.
BauderGLAS Inverted Insulation can be cut, sanded and adjusted.

Walking upon the BauderGLAS Insulation
Walking upon the BauderGLAS Insulation layers is possible during installation but should be done with care.
We recommend that where two layers of insulation are required, both layers are installed prior to walking on.
If required it’s important to use “walking boards” to reach the areas where you want to bring all the other materials such as WFRL, pedestals and paving, etc.
Point loads upon the insulation surfaces are to be avoided, adequate preparation's and care should be taken at all times.
Following trades should not have access to insulated roof areas prior to the surfacing/landscaping being installed unless the insulation is securely protected.
Advice on how to achieve this is available via Bauder Technical.
Small repairs to the BauderGLAS Inverted Insulation coating
Small damage to the BauderGLAS Inverted Insulation coating or small flakes chipped off, can be repaired using BauderGLAS Inverted Insulation Repair Kit (Grey Colour to match the coating).
To ensure a good quality install it is important to repair any damage to the coating.
Should there be any major damage, the insulation should be replaced.
The BauderGLAS Inverted Insulation Repair Kit is a solvent-free 1-component synthetic resin paste which is purpose manufactured for the BauderGLAS Inverted Insulation coating.
It is packed in 25 kg buckets and has a grey colour.
The BauderGLAS Inverted Insulation Repair Kit is applied with a spatula.
Apply the paste evenly and press it into the damaged area, finally smooth off with the spatula, and leave to dry.
To prevent the mix drying out, each time after use, replace the plastic film covering on the product before cleaning the edge of the pail and fitting the lid.
When the pail is closed correctly the paste will not dry out and will remain useable for a long time.
For correct storage and expiry date see the BauderGLAS Inverted Insulation Repair Kit packaging and data sheets.
Using BauderGLAS Inverted Insulation Repair Kit to repair to the edge of the BauderGLAS Inverted Insulation coating:

Water Flow Reduction Layer (WFRL) and surfacings
Install the BauderGLAS JFRI WFRL over the BauderGLAS Inverted Insulation following the manufacturer’s guidelines for all overlaps and necessary details.
Further finishes over the BauderGLAS JFRI WFRL such as pedestals / tiles / gravel / ballast are installed according to the manufacturer’s guidelines.
The BauderGLAS JFRI WFRL minimises the quantity of rainwater which could flow into the insulation system, leading to increased heat loss.
Rain which falls upon the roof percolates down to the WFRL, and then drains away at the rainwater outlets.
The performance of the BauderGLAS JFRI WFRL, and subsequent rainwater cooling effect is taken into consideration when determining the U-value of the roof.

Important notes for the installers of WFRL and paving/ballast
- Installers of the Bauder JFRI WFRL and the finishing (gravel or paving) must take care not to damage the BauderGLAS Inverted Insulation and the BauderGLAS Inverted Insulation coating.
- It is recommended to have the Bauder JFRI WFRL installed over the BauderGLAS Inverted Insulation at the end of the working day.
- Where possible install the insulation, Bauder JFRI WFRL, and finishes such as pedestals and paving in one stage, gradually moving across the work area. This avoids the need for moving the protection boards around; and the finishes also protect the insulation system from damage by other trades.
- If damaged the BauderGLAS Inverted Insulation should be repaired or replaced.
- The base of the pedestal support system should be smooth and flat to evenly spread the loads over the insulation system. A round pedestal base is preferable to a square or rectangular base.
Health and safety information (general)
- PPE should include appropriate safety goggles when cutting, drilling or abrading to protect against dust / projectile material. Wear the PPE generally required for the jobsite with a minimum of gloves to protect against possible sharp edges on the cellular glass board and a suitable dust mask to protect against dust inhalation. BauderGLAS Inverted Insulation is not toxic.
- Safety glasses are a must when handling, cutting, grinding, crushing, or drilling BauderGLAS Inverted Insulation. Wear safety glasses with side shields or dust goggles in dusty environments. Wear goggles for dust protection while cutting or abrading in wind.
- A mouth nuisance dust mask (type FFP1 or higher) is useful when cutting or abrading, but not necessary. BauderGLAS Inverted Insulation dust is not toxic.
Please see BauderGLAS Inverted Insulation PDS for full Health and Safety information relating to this product range.
Landscaping & Surfacing
- Once the membrane has been installed, the general contractor should be advised that it is their responsibility to keep traffic over the membrane assembly to only those trades required to install the specified landscape.
- The Bakor 790-11 monolithic membrane system is described as a “Protected Roof Membrane”.
This means it should ALWAYS covered by some form of build up.
- There are a range of toppings and build-up’s which can be installed over the Bakor 790-11 monolithic system, ranging from a simple inverted build-up of insulation & ballast to a complex Intensive green roof.
- Bauder provides recommended detailed specifications for the correct installation of toppings and landscapes suitable for installation over the Bakor 790-11 monolithic system.
- On vertical surfaces, such as foundation walls, it is a wise precaution to place a drainage layer against the waterproofing, prior to back-filling. The drainage layer protects the membrane and reduces possible hydrostatic pressure.