Manual Sections
BauderBLUE Components Installation
This section describes the correct installation of each specific component for the three BauderBLUE systems:
- STORMcell
- STORMvoid
- STORMsub
The illustrations and information within this guide follow relevant British Standards, National Federation of Roofing Contractors (NFRC), and Construction Industry Research and Information Association (CIRIA).
Prerequisites
Section 1, at the front of this guide, MUST be read and fully understood before installation works commence.
Elements particular to the BauderBLUE components are identified with a blue bullet point; however, the entire section should be comprehended before any installation commences.
Preconditions
The blue roof capacity may be reduced and therefore its performance compromised if the roof structure has significant deflections or back falls from outlets.
The roofing contractor is recommended to forward an 'as built' roof deck deflection survey to Bauder for comment, should there be any concerns.

Technical support
If you require support or advice on green roof and blue roof systems or products within the specification, please contact:
| ■ | Chris Roddick Product Manager | +44 (0)7525 991594 |
| ■ | Head Office | +44 (0)1473 257671 |
| [email protected] | ||