Fertilising
Manual Sections
9.1 DU UK slow-release fertiliser
This organic granular slow release feed can be spread by hand on small roof areas or roofs with a steep pitch, otherwise application is most efficient through using a spreader trolley.
| Technical data | 10 kg | 20 kg |
|---|---|---|
| Coverage | 125 m² | 250 m² |
| Typical application rate | 80 g/m² | |

⚠️ Health and Safety
Fertiliser is an irritant and can affect the skin and eyes. It should be handled with care. Use gloves and avoid handling fertiliser with bare hands. Prevent dust from fertiliser entering eyes or mouth. Always read the Safety Data Sheet prior to application.
⚠️ Storage
Storage: Keep fertiliser dry at all times and reseal bag between applications.
Application
- Fertiliser should only be applied between March and October.
- Ensure the green roof installation is finished and/or all weeding, patching and filling of joints is completed prior to application of fertiliser.
- Distribute using a spreader trolley or by hand on small or sloped roofs.
- Water thoroughly after application with surface watering (not drip line irrigation).

9.2 Spreader trolley application
The spreader trolley enables the distribution of granular fertiliser to be accurate and uniform.
Application
- Position the spreader trolley away from any area of green roof and place a plastic sheet under the trolley to catch any spilt fertiliser. This prevents damage to the vegetation.
- Check the fertiliser spreader instructions to adjust the spread to the correct rate.
- Set the level on the arm of the unit to 'off'.
- Set the dial at the base of the hopper to the correct position (normally '2' for 80 g/m²).
- Fill the hopper sufficiently; do not overfill.
- Set the level on the arm to 'on' and begin to distribute at walking pace.

Tips:
- Typically, BauderGREEN XF 301 and BauderGREEN SB sedum blanket should be fed at 80 g/m² annually, ideally in spring.
- Rates for BauderGREEN WB wildflower blankets will vary.
- Following the lines of the vegetation blanket joints helps ensure even coverage of the whole roof.
- Seed mixes and plug plants levels of fertiliser are incorporated and fertilisation may only be necessary after 12 months (depending on plant growth).