Emergency Overflow
Manual Sections
13.1 Parapet Tell-Tail Overflow DN 50 and Parapet Outlet DN 100
Provide a visible overflow for water build up at roof level. Used in conjunction with other roof drainage outlets to ensure that there is no water ingress into the building and that the structural load of the roof is not exceeded.
| Technical data | DN 50 | DN 100 |
|---|---|---|
| Material | Stainless steel spigot, bitumen flange | Stainless steel spigot, bitumen flange |
| Colour | Black/silver | Black/silver |
| Spigot length | 1,200 mm | 600 mm |
| Angle of spigot | 0° | 0° |
| Nominal width DN OD | 55 mm | 110 mm |
General advice
- With the installation of any flat roof rainwater drainage outlets, BS EN 12056-3:2000 should be observed.
- The rainwater outlet must be fixed to the construction by mechanical fastening.
- Rainwater outlets have to be kept clear for maintenance.
- Rainwater outlets have to be checked at least twice a year.
Parapet Tell-Tail Overflow DN 50 and Parapet Outlet DN 100 are not exclusively blue roof products.
Component parts
- Overflow pipe and face plate (chamfered on one end)
- Face plate seal
- Base plate seal
- Base plate (for insulated upstands only)

⚠️ Warning
The following installation instructions are for DN 50. Instructions for DN 100 can be found in the product technical data sheet.
Installation
- Cut an opening of the correct size (approximately 80 mm) to accommodate the outlet, allowing for the 3° angle of the pipe

- The internal height will be either H-Max for a blue roof or the finished landscape height for a green roof. For insulated upstands, fit the base plate to the wall at the appropriate height. For uninsulated upstands, no base plate is required Screw the enclosed grub screws as a guide into the four threaded holes in the base plate Ensuring the base plate seal is against the wall, fix the waterproofing around the drainage hole in the base plate.

- Prime the base plate then attach the air and vapour control layer, ensuring a good seal is achieved.

- Determine the position of the overflow pipe by fitting the face plate seal onto the grub screws. This will enable the hole to be marked and cut out of the vapour control layer to enable fitting of the overflow pipe.

- A 10 mm hollow punch should be used to mark the holes, then clear the membrane from the screw holes. In the case of an insulated upstand, fit the required insulation board, cutting appropriate holes to accommodate the overflow pipe and grub screws.

- Install the underlayer as per specification and cut out as required to enable fitting of the overflow pipe.

- Remove and replace the grub screws with the large countersunk fixing screws. Tighten in turn to a torque of 25 Nm.

- Prime the face plate and install the cap sheet as per specification, Cut an appropriate hole to allow for overflow drainage.