Separation and Protection Layers

2.1 PE 02 separation layer

Polyethylene foil plastic sheet which acts as a separation/slip layer between the waterproofing and the green roof build-up and is generally used on intensive roofs or under hard landscape up to 3°.

Technical data
ThicknessCa. 0.2 mm
Weight190 g/m²; 50 x 4 m, folded on 1-m roll
Coverage200 m² (in a single layer)

⚠️ Warning
Cutting: Use a flat blade or scissors and a protection board (refer to Section 1.4).

PE 02 Separation Layer

Installation

  • Unroll and unfold PE 02 into a single layer.
  • Overlap by minimum 150 mm at all joints.
  • Lay out to cover entire roof area.
  • Mark the location of outlets and ensure the PE 02 is removed from these positions to maintain drainage.
  • Extend beyond the finished surface level at all upstands. Trim later as required upon completion of the landscaping.

Extensive green roofs:

  • If required, PE 02 must be cut well back from drainage outlets and inspection chambers.

Intensive green roofs:

  • If two layers are required beneath soft landscaping, lay at 90° to each other.

BauderPLANT E

2.2 FSM 600 & FSM 1100 protection layers

Heavy duty protection layer made from polyester and polypropylene fibres.

Technical dataFSM 600FSM 1100
Thickness4 mm8 mm
Size (w x l)2 m x 30 m2 m x 15 m
Coverage60 m²30 m²
Weight600 g/m²1100 g/m²

⚠️ Warning
Cutting: Use a sharp knife or scissors and a protection board (see Section 1.4).

Hot works: Bauder no longer recommends the torching together of FSM layers.

Placeholder image

Installation

  • Lay out protection layer under all green roof finishes, including pebble borders, etc.
  • Roll out over the roof space, allowing a 150 mm overlap at joints.
  • Use metal foil tape tape to hold down the fleece, or 25-kg bags of pebble to counter wind uplift.
  • Can be dressed up perimeter upstands by 100 mm (or to the top of the landscape finish).
  • Should be cut well back from outlets.

Placeholder image

Extensive green roofs:

  • Do not extend FSM protection mat up the perforated face of drainage trims.
  • Cut oversized hole above each outlet.
  • Check outlets are clear of protection mat.
  • On completion of the vegetation installation, trim the FSM protection mat level with the vegetation barrier. Use a cutting board against upstands etc. to cut against.

Placeholder image

Placeholder image

2.3 SV 600 protection layer

Lightweight protection layer made from recycled man-made fibres that also provides some water retention.

 
Technical data
Thickness6 mm
Size (w x l)2 m x 30 m
Coverage60 m²
Weight0.6 kg/m² dry; 3.8 kg/m² saturated

⚠️ Warning
Cutting: Use a flat blade or scissors and a protection board (see Section 1.4).

Placeholder image

Installation

  • Lay out to cover entire roof area. Overlaps to be a minimum of 150 mm or as determined in the specification.
  • Extend beyond the finished surface level at all abutment upstands. This will later be trimmed as required upon completion of the landscaping.

Extensive green roofs:

  • Do not extend SV 600 up the perforated face of drainage trims.
  • Cut oversized hole above each outlet.
  • Check outlets are clear of SV 600.
  • On completion of the vegetation installation, trim the SV 600 level with the vegetation barrier. Use a cutting board against upstands etc. to cut against.

Note:

  • SV 600 can be used as a moisture retention layer under XF 301 sedum blanket in dry areas such as ridge lines on pitched roofs.

Placeholder image

Placeholder image

2.4 GGM 6 protection layer

Heavy-duty protection layer for intensive green roofs made from recycled rubber.

Technical data
Thickness6 mm
Size (w x l)1.25 m x 10 m
Coverage12.5 m²
Weight4.3 kg/m² dry

⚠️ Warning
Cutting: Use a flat blade and a protection board (see Section 1.4).

Compatibility: GGM 6 is not compatible with Thermofol PVC single ply and MUST NOT be laid directly onto this membrane. It is compatible with Thermoplan FPO.

Installation

  • Lay out to cover entire roof area.
  • Overlaps to be a minimum of 150 mm or as determined in the specification.
  • Carefully cut GGM 6 so it fits the full surface area of the roof. For intensive green roofs, do not extend GGM 6 up the perforated face of drainage trims.
  • Cut oversized hole above each outlet. If green roof installation is not imminent, loose laps can be taped together to eliminate the trip hazard.
  • Check outlets are clear of GGM 6.