Flow Restrictors
Manual Sections
12.1 ST-B, ST-HM, SR-B and SR-HM flow restrictors
These specifically engineered flow restrictors fit into the Bauder outlet to reduce the discharge of stormwater into the drainage system at a calculated and predesigned flow rate.
Each flow restrictor comprises four parts: baseplate, overflow pipe, inner seal and outer seal. These are assembled and installed, then the H-Max measured (from the waterproofing level) and marked. The overflow is then removed and cut down to the H-Max.
Blue roofs restrict the flow of water from a roof. It is important that the flow restrictor is not installed until the roof is 100% completed and all activity by other trades has ceased.
| Technical data | ||
|---|---|---|
| Component | Property | Value |
| Base plate | Material | Polyamide |
| Height | 30 mm | |
| Diameter | 176 mm (excluding outer seal) | |
| Overflow pipe | Material | HDPE |
| Height | 250 mm maximum (cut down to H-Max) | |
| Diameter | 75 mm | |
| Overflow aperture | 85 mm | |
| Supply form | Set | 4-part set |

12.2 Setting up the ST and SS base plate
Installation
- Every flow restrictor will require selecting the correct setting according to the specification and layout plan of the roof.
- Lock the position of the adjustable dial.
- Fit the inner and outer seals on the base plate ensuring a tight fit (no snags or lips).

12.3 Setting up the SR base plate
Installation
- Check each flow restrictor is correct and meets specification and blue roof calculations for the particular roof area it is to be fitted on.
- Every flow restrictor is manufactured with a specific number of restrictor holes to meet the roof area SuDS requirements.
- Fit the inner and outer seals on the base plate ensuring a tight fit (i.e. no snags or lips).
12.4 Setting up the overflow pipe
Installation
Insert the base plate into the outlet. This should sit 10 mm below the surface when correctly installed.

Lubricate the chamfered end of the overflow pipe and push into the centre of the baseplate.There is a stop within the baseplate at 27 mm; ensure the overflow pipe is inserted to this point.

From the blue roof calculations provided for the project, measure the H-Max from the top of the waterproofing and mark on the overflow pipe at four separate points.

Remove the overflow pipe and carefully cut the pipe. Care should be taken not to cut the overflow pipe at an angle.Remove any burrs.

Replace the overflow pipe and confirm measurement.Check no debris is blocking any of the restrictor flow holes and install the inspection chamber.