Attenuation-Forming Layers
Manual Sections
10.1 RWR 100 attenuation board
Multi-directional drainage layer used to create the void space in a blue roof. Installed on a protection layer above the completed waterproofing to provide continuous drainage.
All systems utilising the RWR 100 attenuation board must have a protection layer installed beneath the RWR 100. Refer to specification for product to be used.
| Technical data | |
|---|---|
| Size (h x w x l) | 0.1 x 0.6 x 0.6 m |
| Coverage | Per tile: 0.36 m² Per m²: 2.78 tiles |
| Supply form | 96 boards per pallet |
| Connectors | Cross connectors – 500/bag Shear connectors – individually ordered according to requirement |
Cutting: Use a grinder and protection board to avoid damage to the waterproofing or other components (see Section 1.4).
Creating a roof layout plan
- Measure out the blue roof and create a layout plan to accommodate penetrations.
- Allow for a 150-mm gap around the perimeter or penetrations to take into account any thermal expansions.
- Plan the layout so that cut boards are greater than 50% of the full board size.



Single-layer installation
- Ensure specified protection layer is installed correctly before beginning the installation of RWR 100 (see Section 2).
- Any cutting required to boards should be done either diagonally or horizontally and reduced by a maximum of 50%.
- Secure adjacent boards using the cross connectors.
- All perimeter boards must be connected together to form a fixed external edge.
- Each internally positioned board should have at least one cross connector fitted.

Multi-layer installation
- Each layer of RWR 100 must be completed fully before starting the next layer.
- Each layer is connected vertically using the Shear Connectors fitted to the centre of each RWR 100 board.
RWR 100 with ballast finish
- When installing RWR 100 with a simple ballast finish, SV 600 protection layer (see Section 2.3) is used above the RWR 100 as the filtration layer to provide additional protection to the blue roof void.
- The SV 600 should be dressed down the vertical edges of the RWR 100 at all perimeters.

10.2 RE 40 drainage and attenuation board
High-density polyethylene perforated water attenuation and drainage layer used in the STORMsub system. This product is very similar to DSE 40 and has additional drainage holes in the bottom of each storage cell.
| Technical data | |
|---|---|
| Thickness | 40 mm |
| Size (w x l) | 1.04 x 2.03 m |
| Weight | 1.8 kg/m² dry |


Installation
- Normally installed over a protection layer.
- Lay each sheet (open cells up) over entire area so they overlap by one full cell, as marked by 'X' on each sheet.
- Stagger the joints, brick pattern.
- Cut a hole in the attenuation board above the outlet slightly larger than the inspection chamber.
- Fit the attenuation board around the inspection chamber (see Section 7.1).
Installation with drainage trim
- Install and inspect drainage trim (see Section 7) prior to fitting RE 40.
- RE 40 should be cut to about the edge of the drainage trim.
Installation with vegetation barrier
RE 40 should run under the entire area of the green roof from upstand to upstand, including below the vegetation barrier.
Installation with hard landscaping
Where porous hard landscaping features are to be formed, install porous concrete or subbase materials directly into the cells of the RE 40.

Tips:
- RE 40 is normally filled with SUB-RE UK blue roof substrate as part of the STORMsub system (see Section 11.1).
- Where a number of sheets of RE 40 come together at one point, overlapping every cup on the sheets edge is not possible.

10.3 Pedestal supports
This system uses Bauder's range of pedestal supports to form the blue roof void within the STORMvoid system.
Bauder supply three pedestal systems:
- DPH

- PB

- NC

The pedestal layout will vary depending on the paving specified above it.
The paving must be installed at least 35 mm above the H-Max to enable the flow restrictor's overflows to function correctly.
The H-Max must be greater than 75 mm below any level threshold access point.