Accessories
10.1 Perimeter trims
Bituminous membranes
- The first layer of membrane must be self-adhesive and dressed to the full extent of the detail using flame-free methods. This is to ensure that the detail is fully encapsulated to reduce the risk of fire to exposed combustible materials.
- Dress the underlayer up and over the perimeter detail to provide a 25 mm overhang.
- Please refer to Bauder standard detail drawings.
Trim
- Setting out: 10 mm gap between the back edge of the bottom of the drip to the fascia/wall and 3 mm gap between abutting lengths of trim.
- Fasteners: Screw fasteners of type appropriate to kerb or deck substrate. Nail fixing is not permitted.
- Fixing: 30 mm from ends and at 300 mm (maximum) centres, stagger fixed. Can be used to retain the capping sheet where the capping sheet is taken to the full extent of the detail – please see Bauder detail drawing.
• 150 mm deep trims (type 6) – 3 no. additional fixings per length of trim. The fixings are to be face fixed with screws and positioned 75 mm down from the top edge, one fixing 100 mm in from each end and one in the centre and capped with coloured matched plastic weathering caps.
Note: A fixed timber packer will be required behind the face of the trim to help facilitate ease of fixing.
- Jointing sleeves/bridging piece: All lengths should be close butt jointed using an internal jointing sleeve. This must be provided to each joint.
- Corner pieces: Purpose made.
Completion of bitumen membrane
- Contact surfaces: Prime with Bauder Primer.
- Joints: Cover with 200 mm long pads of bitumen membrane, bonded to trim.
- Top layer/capping sheet: Butt joint to rear edge of trim.
- Cover strip: Fully bond to trim and top layer/capping sheet of bitumen membrane. Carry over roof edge upstand and lap 100 mm onto roof. The capping sheet is to be dressed tightly into the top lip of the trim, ensuring a bead of bitumen extrudes at the edge. Please see Bauder detail drawing.
- Wall/kerb joints: The new trim must cover any open joint that may exist at the top of the kerb or wall, by a minimum distance of 20 mm.
10.2 Water check trims
Bauder GRP Water Check Trim to be used on parapets and perimeter kerbs over 200 mm in width – must not be used on its own as a check kerb.
Important:
Where the top of the parapet is installed flat or has no inward fall, we would suggest using the GRP Water Check Trim to avoid any standing water being blown over the trim and staining the brickwork/render.
Should also be used on parapets with a width greater than 200 mm.
Bituminous membranes
- The first layer of membrane must be self-adhesive and dressed to the full extent of the detail using flame-free methods. This is to ensure that the detail is fully encapsulated to reduce the risk of fire to exposed combustible materials.
- Dress the underlayer up and over the perimeter detail to provide a 25 mm overhang.
Please refer to Bauder standard detail drawings.
Trim
- Setting out: The bottom inside lip of the drip to sit flush with the fascia/wall, leaving a 3 mm gap between abutting lengths of trim.
- Fasteners: Screw fasteners of type appropriate to kerb or deck substrate. Nail fixing is not permitted.
- Fixing: 30 mm from ends and at 300 mm (maximum) centres, stagger fixed. Can be used to retain the capping sheet where the capping sheet is taken to the full extent of the detail – please see Bauder detail drawing.
- Jointing sleeves/bridging piece: All lengths should be close butt jointed using an internal jointing sleeve. This must be provided to each joint.
- Corner pieces: Purpose made.
Completion
- Contact surfaces: Prime with Bauder Primer.
- Joints: Cover with 200 mm long pads of bitumen membrane, bonded to trim.
Completion of bitumen membrane
- Top layer/capping sheet: Butt joint to rear edge of trim.
- Cover strip: Fully bond to trim and top layer/capping sheet of bitumen membrane. Carry over roof edge upstand and lap 100 mm onto roof. The capping sheet is to be dressed tightly into the top lip of the trim, ensuring a bead of bitumen.
- Wall/kerb joints: The new trim must cover any open joint that may exist at the top of the kerb or wall, by a minimum distance of 20 mm.
Tip:
Run a penny roller along the length of the membrane flashing as close to the lip of the trim as possible, to ensure adhesion is achieved.
Using a hand roller, remove any trapped air/gas by applying pressure on the membrane with the roller, at the same time extracting a neat 5-10 mm bead of bitumen.
10.3 Welted drips
- Material for flame-free: Bauder KSO SN or Bauder KSO-P SN, using flame-free methods.
- Material for Safe2Torch: Torch applied Bauder slate finished capping sheet, using Safe2Torch methods. Please refer to Bauder standard detail drawings for Welted Drip detail.
- Length: Form using maximum width strips.
- Height at external gutter (minimum): 7 mm.
- Welt tail: Nail to face of drip batten. Fold neatly around a pre-primed suitable former.
- Welt: Bond together; carry minimum 150 mm onto roof. Overlap with bitumen membrane capping sheet.
- Mansard roofs: A new lead flashing is to be installed behind the batten and dressed down over the top mansard tiles prior to installing the welted drip detail.
Important:
Self-adhesive bitumen is affected by UV exposure. Slide drip flashing behind the former, then fix and dress each flashing consecutively. Do not hang all flashings before fixing, otherwise they will only adhere by torch activation.
Image of welted drip to external gutter
10.4 Outlets
The components that form part of the Bauder waterproofing system, and for guarantee reasons, should only be installed by Bauder approved contractors. Connectivity to below deck drainage pipework to be the responsibility of the plumbing contractor.
Important:
All outlets should have a separate flashing of AVCL/underlayer to isolate the outlet from the system, as per standard detail drawings.
Bauder Vertical Outlets installation requirements
- Fixing – The outlet is to be secured through the rim to the structural deck by a minimum of four fasteners appropriate to obtain an adequate attachment to the deck substrate material. Some deck structures require preparatory works before the outlets can be installed.
- Concrete decks – the opening for the vertical outlet(s) to be either pre-cast or core-drilled so that the outlet can be installed at the same time as the air and vapour control layer/underlayer. Provision for a 250 mm diameter opening is required.
- Profiled metal decks – these require a 250 mm diameter. Opening cut into the decking, but in addition will require a 600 x 600 x 1.25 mm galvanised steel reinforcing plate secured to the deck before the outlet can be installed. This item has a pre-cut 250 mm diameter hole and is available from Bauder.
Note: For detailed information and for further information on vertical and refurbishment outlets, please refer to the specific Bauder Technical Data Sheet.
10.5 LiquiPOCKET Detailing Kit
Preparation: Ensure that the surface receiving the Bauder LiquiPOCKET is clean, dry and free from dust, laitance, grease, oil, and any other contaminants.
Protection: Cover the completed waterproofing membranes with a clean tarpaulin to protect from any spills and splashes.
Metal: All flaking paint should be removed back to clean metal. Any rust should be treated with a suitable rust inhibitor strictly in accordance with the manufacturer’s instructions.
Plastics: Roughen surface with sandpaper to provide a key.
Application: Create frame and apply Bauder LiquiPOCKET to specified areas, in strict accordance with the Bauder application instructions and drawings provided within each kit. Application is straightforward, but Bauder will provide on-site training in the use of this product on request.
Important:
The product must not be used in any areas of Bauder roof systems without prior consent of Bauder Limited. Where this product is used, it will be covered under separate guarantee terms and conditions.
10.6 SVP Cover
Image displaying SVP cover on bituminous roof

| Flange Material | Part Code | Product Dimensions | To suit vent pipe | |||
|---|---|---|---|---|---|---|
| Part 2 Dia. A | O-Ring Dia. B | Part 1 C | Internal Dia. Max./Min. D | Outer Dia. maximum E | ||
| RBM | RBM 110 – GB14109100 | 85 | 12 | 125 | 109 / 87 | 110 |
| RBM 250 – GB14109250 | 90 | 8 | 250 | 110 / 92 | 248 | |
| RBM 160 – GB14109160 | 145 | 8 | 180 | 181 / 147 | 165 | |