Preparation of the Deck

2 Preparation of the Deck

  • Carry out all preliminary work such as formation of independent upstands, kerbs, box gutters, sumps, grooves, chases and expansion joints.
  • Fixing of battens, fillets and anchoring plugs/strips.

2.1 Plywood decks

  • Plywood should conform to BS EN 636-3 condition of use Service Class 3 (Exterior) and Use Class 3, minimum 18 mm thickness as specified by client.
  • Cold roof specifications will require AP1 cut to size by the contractor to be used on the joints. Retained in place using clout nails.

2.2 OSB/3 decks

  • OSB/3 should conform to BS EN 300, minimum 18 mm thickness as specified by client.
  • Cold roof specifications will require AP1 cut to size by the contractor to be used on the joints.

2.3 Timber decks

  • Nail the sacrificial layer TA 600 polyester based membrane, to timber boarded decks (close butted or T&G), and MUST also be used on cross laminated timber panel decks.
  • Unroll, lay fleece side down, align and cut to length and work from one end. Minimise wrinkles.
  • Random nailed in the field area at maximum 150 mm centres. At perimeter of roof and all side and head laps with maximum 50 mm centres.
  • Side and head laps to be minimum 50 mm.
  • Nails should be at least 20 mm long, extra-large-headed galvanised steel clout nails conforming to BS 1202-1.

Page 11_2

2.4 Metal decks

  • The new metal deck should be of a suitable type/profile to support the air and vapour control layer and insulation and achieve an approximate bond area of 50% when adhering to the crowns i.e. the crowns should be wider than the troughs. This is calculated by dividing the crown width by the pitch then multiplying this by 100. Metal decks with profile stiffeners in the crown will further reduce the effective bond area.
⚠️ Warning
For all deck types:

If the membrane cannot be pulled away and distorts when pulled then the bond is considered satisfactory.

2.5 Concrete decks

  • The surface of the concrete should be finished with a wood float to provide a suitably even surface free from ridges, hollows, and surface irregularities.
  • A concrete surface which is not adequately even, or does not provide adequate drainage falls, should be screeded to correct these points.
  • Provision should be made for drying out the slab properly before waterproofing commences to ensure good adhesion.
  • Generally, in-situ structural concrete has a curing time of 28 days to get to optimum strength (this can be up to 60 days if concrete is used in conjunction with a structural metal tray). This curing time should not be confused with the drying time. After the concrete is properly cured it will then need to be assessed to prove the moisture levels are at acceptable levels in order to achieve the correct adhesion to the surface of the concrete. Any surface laitance will need to be removed by scabbling or jet washing, prior to waterproofing installation.
  • A peel test should be carried out to check adequate adhesion to the concrete/screed. Alternative testing methods can be employed, including a moisture meter and/or a ‘Plastic Sheet Test’ using polyethylene sheet or rubber mat.

Page 12_1

2.6 Peel test for concrete decks

  • Clean a small area of the substrate being tested (1m²) by using a soft broom to remove any dirt/debris from the surface.
  • Apply the specified primer to the substrate and allow to dry as per Bauder recommendations.
  • Once the primer has dried, apply the specified AVCL or underlayer as per Bauder recommendations leave overnight.

Page 12_2

Checking results

  • Submit and arrange for inspection.
  • Cut a V-shaped incision through the AVCL/underlayer in the centre of the test patch.
  • Lift the membrane at the point of the ‘V’ and pull back.
  • If the membrane can be peeled up easily from the substrate, then the substrate has not dried out sufficiently or there is an issue of contamination or laitance with the surface.