Underlayers
| Underlayer | Application |
|---|---|
| BauderTEC KSA DUO 35 | Self-adhesive |
| BauderTEC KSA DUO | Self-adhesive |
| BauderTEC Sprint DUO | Self-adhesive |
| BauderFLEX G4E | Torch-applied |
| Bauder EGV 35 TF | Torch-applied |
Important:
Form all details in such a way that a fully bonded 100mm lap is obtained between the air and vapour control layer and the underlayer – please see Bauder bituminous detail drawings.
Self-adhesive Underlayers - care should be taken to ensure adhesion when the temperature is below + 5° C.
6.1 General guidance for all underlayers
Side and end laps: Head laps to be 100mm and staggered, side laps to be 80 mm, laid with all laps heat sealed to provide a continuous bitumen bead extrusion.
All laps to upstands, edge details, flashings, etc., to be a minimum 100 mm. All laps torch sealed to provide a continuous bitumen bead extrusion. The underlayer must be taken up all upstands, edge details, in accordance with current British Standards and Bauder recommendations.
Penetrations: Fully seal using bonding methods recommended by Bauder. Please see Bauder bituminous detail drawings.
Exposed edges of insulation at roof perimeters, abutments, upstands, kerbs, outlets, penetrations:
Prevention of wind uplift (where required): Mechanically fix as per the corresponding project specific wind load calculation, using appropriate thermally broken fasteners fixed through to the deck/substrate.
Upstands
Insulated upstands: Facing of insulation to receive a coating of Activator-Primer on all insulated upstands prior to the installation of the underlayer. This will ensure sufficient adhesion is achieved between the insulation and underlayer and will remove the need for mechanically fixing through the underlayer prior to installation of the capping sheet.
At ends of rolls: Underlay layer only, form with bitumen membrane carried up without using separate strip.
Layers of bitumen membrane: Carry in staggered formation up the upstand, with each layer fully bonded.
For cold roofs: The underlayer must be dressed up all upstands and to the full extent of the detail. This is to ensure that the detail is fully encapsulated to reduce the risk to exposed combustible materials.
6.2 Self-adhesive underlayers
Bauder membranes KSA DUO 35, KSA DUO & Sprint DUO are cold applied and fully bonded by removing the peel-off release film. All self-adhesive underlayers can be used in both flame-free and torch-safe zones.
Bond: Full over whole surface, with no air pockets. Cold applied and fully bonded by removing the peel off release film.
Side laps: To be 80 mm and must be laid red over blue, and heat sealed/torched (depending on flame-free & torch-safe zones) and rolling with the Bauder Long Handled Lap Roller to extrude a continuous bead of bitumen.
Head laps: To be 100 mm and staggered, and heat sealed/torched (depending on flame-free & torch-safe to extrude a continuous bead of bitumen.
Upstands: The underlayer must be taken up all upstands, edge details, in accordance with current British Codes of Practice and Bauder recommendations, and fully heat sealed/torched (depending on flame-free & torch-safe zones) with the air and vapour control layer by a minimum 100 mm in the flame-free and torch-safe zones.
The side laps are to be 80 mm and must be laid red over blue and sealed with appropriate heat sources according to NFRC Safe2Torch guidelines:
- A hot air gun in flame-free zones.
- Gas torch in torch-safe zones.
A coat of Bauder Activator Primer (canister) - Black must be installed to all flat and vertical surfaces of the insulation prior to installing the self-adhesive underlayer to ensure adhesion of the underlayer. See Section 3.2 for application instructions.
Installation to field areas
- For self-adhesive membranes apply a coat of Bauder Activator-Primer (Canister)-Black to the insulation. See Section 3.2 to ensure adhesion of the underlayer.
- Lay out the membrane and align so that the membrane runs straight.
- Roll back the membrane on the spindle to half the length of the roll and ensure it is wound tight onto the spindle.
- Using the straight-bladed knife, carefully cut across the release film to the full width of the roll.
- Pull the release film, so that the membrane unrolls onto the substrate.
- Roll out applying pressure to ensure adhesion to the substrate. Any air pockets should be rolled over with the long handle lap roller to remove them.
- Complete for the remaining half of the roll.
- Side laps – heat seal ensuring a continuous bitumen bead extrusion is achieved.
- Head laps – heat seal ensuring a continuous bitumen bead extrusion is achieved.
| Acceptable alternative underlayers for systems are listed below: | |
|---|---|
| BTRS PLUS | BauderTEC KSA DUO 35 can be replaced with BauderFLEX G4E (in torch-safe zones only) |
| BTRS | BauderTEC KSA DUO can be replaced with BauderFLEX G4E (in torch-safe zones only) |
| Bauderflex | BauderTEC Sprint DUO can be replaced with Bauder EGV 35 TF (in torch-safe zones only) |
Installation at detailing
- Cut appropriately sized and shaped membrane pieces appropriate to the detail.
- Press the membrane into/around the detail to ensure it will fit. Carefully cut the release film halfway across the membrane piece.
- Remove one half of the release film and press the adhesive side into the detail, consolidate with a hand roller. Heat seal the laps ensuring a bitumen extrusion is achieved.
- Remove the remaining half of the release film and press the adhesive side into the detail, consolidate with a hand roller. Heat seal the laps ensuring a bitumen extrusion is achieved.
Important:
For detailing to un-insulated abutment upstands, where the waterproofing is to be applied to rough or uneven non-combustible surfaces i.e. brickwork or concrete, it is permissible to use an alternative Bauder torch-on underlayer appropriate to the specified system where this product is considered to be better for application to these surfaces.
For all other situations, and particularly to vertical insulation, the Bauder self-adhesive underlayer appropriate to the specified system must be used.
6.3 Torch-on underlayers
The Bauder torch applied underlayers are G4E and EGV 35 TF and used in torch-safe areas.
Bond: Partially bonded.
NB: Where surface is uneven or not suitable for a self-adhesive membrane and where the surface is of a non-combustible material and is not required to be a torch-free zone – it is permissible to use a flame-applied underlayer, so long as the product is a recognised component of the system specified.
Important:
Torch-on underlayers must not be used:
- In flame-free zones (see Section 1.2).
- On foil-faced insulations, (FA-TE and FA Tapered).
Torch-on underlayers can only be used on glass tissue or bitumen faced insulation or to a non-combustible substrate in torch-safe zones.
| Membrane Type | Maximum length of time membrane can be left exposed |
|---|---|
| KSA DUO 35, KSA DUO & Sprint DUO | 2 months |
| EGV 35 TF | 4 months |
| FLEX G4E | 6 months |
| Bauder insists an inspection is carried out before installation of the next layer to ensure waterproofing integrity. | |
6.4 Underlayer at upstands
At ends of rolls: Underlay layer only, form with bitumen membrane carried up without using separate strip.
Layers of bitumen membrane: Carry in staggered formation up the upstand, with each layer fully bonded.
For cold roofs: The underlayer must be dressed up all upstands and to the full extent of the detail. This is to ensure that the detail is fully encapsulated to reduce the risk to exposed combustible materials.
Cap sheet cover flashing: A separate flashing of capping sheet will be required to cover the fixings. See Section 9.1.