Mechanical Fixing of Bitumen Membranes
9.1 Mechanical fixing of bitumen membranes on upstands
Terminating capping sheet on the vertical
To terminate the capping sheet on the vertical, a Bauder aluminium peel bar is to be used along with appropriate fixings (depending upon substrate) at 150 mm centres. Where it is terminated on the vertical it will need to be covered with the specified flashing material dressed over the top to ensure waterproofing integrity. Should a traditional lead cover flashing be used, then a separating tape will need to be used between the aluminium bar and lead flashing.
Note: A Bauder termination bar is not to be used in this scenario unless it has been specified by Bauder.
Mechanically restraining the capping sheet on the horizontal
To mechanically restrain the capping sheet when the capping sheet is taken onto the horizontal on top of the parapet, Bauder aluminium peel bar (at 150 mm centres) or screws and washers will be specified and along with appropriate fixings (depending upon substrate). Please refer to table.
Note:
Cap sheet cover flashing - A separate flashing of capping sheet will be required to cover the fixings (please see Bauder detail drawings).
Bauder aluminium peel bar
Pre-drilled hole size 6.5 mm to suit fasteners up to 6.3 mm diameter. Not suitable for tube washers.
Installation
- Align on the vertical.
- With appropriate fixings, fasten through the Bituminous system at 150 mm centres.
- Leave a 10 mm wide gap between each section of peel bar to allow for expansion and contraction.
Notes for mech fixing insulation on upstands:
- 5 fixings for BauderPIR FA-TE – one in each corner and one in the centre.
- 1 fixing for BauderROCK – in the centre of the board. BauderROCK should always be mech fixed with one fixing, even when adhering due to the weight of the board.
| Bitumen insulated upstands | |||||
|---|---|---|---|---|---|
| Upstand height | Between 250 mm & up to 500 mm | 500 mm | 600 mm | 600 mm to 900 mm | Up to 1100 mm |
| Insulation attachment | Follow specification for fixing method. | ||||
| Insulation facing | Coated with Bauder Activator-Primer Black. | ||||
| Capping sheet fixing on the vertical face | Yes – top leading edge using Bauder aluminium peel bar. Fixings at 150 mm centres. | ||||
| Capping sheet fixing on the horizontal face | Yes – top leading edge using Bauder aluminium peel bar. Fixings at 150 mm centres. Alternatively, screws and washers. 5 no. fixings per sheet width. | ||||
Important:
Anything above 1100 mm (this includes mansard and dormer side panels):
Upstands exceeding approximately 1100 mm should be checked with Building Control due to consideration of the fire regulations (Building Control may advise a lower max. height).
For upstands using only self-adhesive membranes, these will need to be mechanically fixed at the top leading edge of the membrane with Bauder aluminium peel bar regardless of the upstand height. This will be for System Airtech and for areas referred to as flame-free zones.
Tips:
Fixing pattern using 5 fixings per linear metre: Set two fixings, one either side of the sheet set in 50 mm from each edge. The three remaining fasteners equally spaced in between.
Screws and washers:
IWF-5.2x35 screws together with associated IFC/IW-82x40 galvanised pressed steel washer plates.
Fixing pattern: Set two fixings, one either side of the sheet set in 50 mm from each edge. The three remaining fasteners equally spaced in between.
| Bitumen un-insulated upstands - Fixings required for Bauder Underlayers & Capping Sheets in accordance with BS 8217 & Bauder recommendations | |||||
|---|---|---|---|---|---|
| Upstand height | Between 250 mm & up to 500 mm | 500 mm | 600 mm | 600 mm to 900 mm | Up to 1100 mm |
| Substrate | Coated with specified primer. | ||||
| Capping sheet fixing on the vertical face | Yes – top leading edge using Bauder aluminium peel bar. Fixings at 150 mm centres. | ||||
| Capping sheet fixing on the horizontal face | Yes – top leading edge using Bauder aluminium peel bar. Fixings at 150 mm centres. Alternatively, screws and washers. 5 no. fixings per sheet width. | ||||
9.2 Mechanical fixing of bitumen membranes on slopes above 5 degrees
18 mm WBP plywood or OSB/3 capping sheet retention plate
When insulation is to be incorporated within the system, the retention plate should be installed to allow provision for mechanical fixing of the top leading edge of the capping sheet. The plate should run continuously across the roof slope coinciding with where the top leading edge of the capping sheet occurs.
A continuous run of the retention plate will be required for each row where the cap sheet head laps are staggered. Head laps should not be fixed in a continuous line, unless the roof is less than the length of the roll from the ridge to the gutter eaves.
Retention plate to be installed in accordance with the relevant Bauder guidance sheet. Size: 18 mm x 300 mm x 2400 mm.
- Insulation thickness: Where the mechanical retention plate is to be incorporated, the insulation below needs to be 20 mm thinner to ensure the plate finishes virtually flush with the main area insulation. Mechanically fix the plate through to the deck using the specified thermally broken fasteners.
- Priming: Bauder Activator-Primer (Canister), APR01-Black, to seal and prepare the surface of the mechanical retention plate prior to the application of Bauder membranes.
- Setting out of membranes: Parallel to roof slope, with successive layers carried over ridges.
- Lengths (maximum): As per roll length.
- End laps: Half stagger and align on alternate bitumen membranes. - Additional fixing of bitumen membranes: Fixing pattern using 5 fixings per linear metre: Set two fixings, one either side of the sheet set in 50 mm from each edge. The three remaining fasteners equally spaced in between.
- Screws and washers: IWF-5.2 x 35 screws together with associated IFC/IW–82 x 40 galvanised pressed steel washer plates.
- Fixing pattern: Set two fixings, one either side of the sheet set in 50 mm from each edge. The three remaining fasteners equally spaced in between.