Insulation
Bauder has a wide range of insulations in both flatboard and tapered format for specification within a bituminous system.

5.1 Tapered insulation schemes
This is a specialist project scheme for increasing or creating falls on a roof and requires a separate design and specification. For the installation of a BauderPIR FA G16 tapered scheme please refer to a separate document: Bauder FA Tapered Insulation Installation Guide, available from our Technical Department.
5.2 Flatboard insulation setting out
- Long edges: fully supported or for a metal deck - run at right angles to metal deck troughs.
- End edges: fully supported.
- Side joints: close butted together.
- End joints: stagger brick pattern.
- Rebated edge boards: these must interlock with each other.
- Passivhaus - any spacing between the boards would need to be reduced to maximum 3 mm gaps where there is a ‘Passivhaus’ requirement. Boards may need to be ‘shaved’ to achieve this requirement along the full length/width of the board. Where boards must be cut, correct equipment – such as a proprietary, cordless insulating material saw with guide rail for polyisocyanurate (PIR) and stone mineral wool, or a hotwire cutter for expanded polystyrene (EPS) and extruded polystyrene (XPS) – should be used to leave a straight, square edge. Handsaws with flexible blades should not be used.
5.3 Mechanically fixing the insulation
Minimum quantity of fixings per board needs to meet wind load calculations for perimeter, corners, and field roof areas, and different quantities may be required for each zone and each project.
Project fixing plan should be provided by the fixing supplier to meet wind uplift loads for the project.
Installation
- Use insulation tubes and fastener type/length recommended by the supplier for the project.
- Install according to project fixing plan to the quantity required to meet wind uplift calculations for the different roof zones (perimeter, corners, field area).
- Always refer to the wind uplift calculations for number of fasteners per board.
Fixings should meet the following criteria:
- A thermally broken sleeve to ensure the required U-value for the roof is achieved.
- Minimum 75 mm diameter washer or a square stress plate of minimum dimension 70 x 70 mm.
- Fastener of suitable type and length to penetrate board thickness and deck construction. For metal, plywood and OSB decks the fastener should penetrate through the substrate by 15 - 20 mm.
Tips:
- The number of fasteners per board will be defined by the wind load calculation.
- For ease and speed of application, contractors may choose to install the stated number of fasteners required in the corner zones (high risk areas) across the entire roof area and thereby disregard the need for different fixing patterns in each zone.
5.4 Adhering insulation to bituminous AVCL
Specific adhesives are required to bond the different types of insulation to the AVCL, See page 21, 22, 23 or 24 as appropriate. Refer to table below for suitability.
| Adhesive compatibility for bonding Bauder insulation to AVCLs (AVA35, KDS FBS, Super AL-E, DS 1 DUO) | PU Insulation Adhesive (Twin Cartridge) - Brown | PU Insulation Adhesive (Tin) - Brown |
|---|---|---|
| BauderPIR FA TE (foil-faced flatboard) | ✓ | ✓ |
| BauderPIR FA G16 tapered (foil faced) | ✓ | ✓ |
| BauderPIR T G tapered (un-faced) | ✓ | ✓ |
| BauderVIP TE | ✓ | ✓ |
| BauderROCK | ✓ | ✓* |
| BauderGLAS | ✓ | ✓* |
*Water spray overmist required. Please refer to specific Technical Data Sheet for coverage rates and installation guidance.
Refer to the project specification to confirm type of adhesive to use. See table below for compatibility.
Use the correct adhesive as per specification along with the correct associated tooling, such as guns, hoses, rollers, etc.
Information regarding handling, storage and disposal of adhesive containers can be found on the latest version of the Technical/Safety Data Sheet, which must be consulted before use.
Installation
- Close butted and staggered all boards in a ‘brick pattern’.
- Bond each board to the AVCL with the specified adhesive, ensuring an adequate fix. The installation method and coverage rates are specific to the type of adhesive and the project wind uplift calculations.
Important:
- Always refer to the specification for the given roof area for the specific product and amount of adhesive to use.
Bauder PU Insulation Adhesive - Twin Cartridge can be used for adhering all types of Bauder insulations to the AVCL and can also be used for foil to foil applications.
Cannot be used for bonding GFS G16 (ridge infills) / KFS G16 (valley infills) on PIR FA G16 Tapered schemes.
5.4.1 Installation of Bauder PU Insulation Adhesive - Twin Cartridge
- Apply in strips following the direction of the board length to give continuous and equally spaced adhesive beads within each board width. Refer to table below.
- Adhesive beads are applied 6 mm wide and will then foam to 20 mm wide.
- Immediately place board onto the adhesive and apply pressure to the board to ensure full contact.
- Allow to cure before waterproofing the insulation boards (10 mins at 20°C).
| Board width (mm) | Field zone* | Perimeter zone* |
|---|---|---|
| 450, 500 or 600 | 2 | 3 |
| 800 | 3 | 4 |
| 1000 or 1200 | 4 | 6 |
Note: *BS EN 1991-1-4 uses the following guidance to calculate perimeter zones. Buildings up to and including 10 m in height have a perimeter zone of not more than 2m. Buildings over 10 m, uses the calculation of 2 x the building height ÷ 10. These are general guidance rules and do not take into account all of the information used in a full wind uplift calculation, they are therefore superseded by a project specific calculation.
5.4.1 PU Insulation Adhesive (Tin) - Brown
Used for bonding all Bauderwarm roof insulations to the mica-faced AVCL.
MUST NOT be used for bonding insulations to insulations or AVCL’s in foil to foil applications.
MUST NOT be used for bonding GFS G16 (ridge infills) / KFS G16 (valley infills) on PIR FA G16 Tapered schemes.
A spray water over mist to the wet adhesive must be used for bonding BaudeROCK & BauderGLAS insulations to AVCL’s and in a build-up incorporating more than one layer of these insulants.
Coverage rate of 40 m² per tin.

- Apply in strips following the direction of the board length to give continuous and equally spaced adhesive beads within each board width.
- See Table 1 Section 5.4, for recommended number of bead strips for different board sizes.
- Ensure adhesive beads are 10 - 20 mm wide.
- Immediately place board directly onto the adhesive.
- Apply pressure to the board to ensure full contact. If the insulation board rocks (especially on the laps), then score the back of the board to fully adhere to the AVCL.
- Allow to cure enough so that the installation of the underlay does not affect the bond between the insulation and AVCL.

Important:
- Always refer to the specification for project specific adhesive and amount to use.
- During extreme heat, add a water over mist to the wet adhesive before bedding the PIR boards to help the curing process, avoid excessive overwetting.
5.5 Adhering multi-layer insulation (bonding insulation to insulation)
Installation
- Bond first layer of insulation boards to the AVCL using the specified adhesive and leave to cure, see Section 5.4
- Set out the next layer of insulation so that the boards are off-set and staggered, as per example image above.
- Use the specified adhesive to bond the second layer of insulation to the first. See Section 5.1 and 5.5.1 as appropriate.
Additional layers of insulation boards should be bonded giving continuous and equally spaced adhesive beads within each board width.
The second layer of boards should be laid off-set and staggered.

5.5.1 Bonding foil-to-foil insulation surfaces
When both layers of insulation are foil faced, i.e. FA-TE to FA-TE, FA G16 Tapered to FA-TE.
Installation with Bauder Activator-Primer (Canister) - Black
- Ensure the canister spray-system is spraying correctly and the spray-pattern is 150-200 mm wide, depending upon insulation board size.
- Apply one coat of Bauder Activator-Primer to the top surface of the first layer, ensuring an even distribution of contact adhesive is achieved. Approximate coat weight 80g/m².
- Apply one coat of the Activator-Primer to the bottom surface of the second layer following the recommended spray pattern to achieve a 100% coverage in the perimeter zone and 50% coverage in the field zone, (please refer to note in Section 5.4) ensuring an even distribution of contact adhesive is achieved. Approximate coat weight 96g/m² for perimeter zones and field zones approx. total of 144g/m² when a combination of 100% & 50% coverage is applied.
- N.B. The spray pattern is set in from the edge of the insulation board to allow consistent adhesion strips when staggering insulation layers.
- Allow the non-flammable solvent & propellant to evaporate from the primer for a minimum of 10 minutes at 20°C depending on temperature and wind speed.
- Avoid trafficking immediately after application of 3-5 minutes depending on ambient temperatures.
- Once the solvents have evaporated, the surfaces should appear tacky to the touch. Once this has been achieved, place the second insulation layer onto the first layer and apply pressure to the second layer to achieve contact.
ONLY two adhesives are compatible for bonding foil-to-foil surfaces together.
- Bauder Activator-Primer (Canister) - Black
- Bauder PU Insulation Adhesive (Twin Cartridge), see Section 5.4.1 for installation instructions.

Spray pattern of Activator-Primer
Tips:
- Avoid excessive spray as drying time will be increased.
- If there are undulations on the roof area, then the back of the insulation board will need to be spliced before application of the first and second layer of Activator-Primer.
- Use Bauder Spray Gun Nozzle Cleaner to remove material or over spray from the spray tip.
Important:
- Always refer to the specification for the given roof area for the specific product and amount of adhesive to use.
- Activator-Primer MUST NOT be used for bonding insulation to mica faced AVCL’s.
- Activator-Primer MUST be used for bonding GFS G16 (ridge infills)/KFS G16 (valley infills) on PIR FA G16 Tapered schemes.
5.6 Insulation to upstands
Insulation to upstand showing insulation support bracket.
5.7 PIR T KL 50 (angle fillets)
Bauder 50 mm x 50 mm PIR T KL 50 (angle fillets) for use with insulated and un-insulated upstands to reduce/soften a 90 degree internal angle between a horizontal and vertical intersection and make it easier to seal.
Installation
- Provisionally bonded in suitable Bauder PU Insulation Adhesive or Bauder Activator-Primer (Canister) - Black, to the upper surface of the insulation on the horizontal and the vertical surface of the upstand.
- Subsequently the angle fillet is retained when the underlay detailing is applied.
Must be used at all right-angled upstands.
For different insulation types, the corresponding angle fillet must be used:
- PIR T KL 50 angle fillets for all forms of PIR Insulation & 2 layer waterproofing systems.
- BauderROCK Angle Fillets for all forms of ROCK insulation.
- BauderGLAS Angle Fillets for all forms of GLAS insulation.
Important:
Under no circumstances must fillets of an alternative material be incorporated (i.e. timber, cork, fibre, etc.) as this would invalidate the guarantee.
5.8 Hard edges to protect exposed edges of insulation
The creation of protection or hard edges to prevent mechanical damage to the insulation at gutter edges, drip edges etc. The dimensions of the hard edge protection will vary to accommodate the thickness of the insulation and waterproofing build-up in order to avoid the creation of a water check.
There are two types of protection:
- Timber hard edge – can be used in any location and MUST be used on external edges of buildings.
- Metal hard edges – To be used on internal gutters or sumps on warm roofs where the insulation from the flat area steps down. Can also be used on a change of level but must not be used on externals of buildings – A timber hard edge MUST be used in these locations. Step up details require ply protection when over 250 mm high. Please refer to Insulated Upstands detail.
5.8.1 Timber hard edge
Quality: Planed, free from wane, pitch pockets, decay and insect attack (except ambrosia beetle damage).
Moisture content at time of covering (maximum): 22%.
Preservative treatment: Please note organic solvent-based timber preservatives are not permitted, as these attack bitumen-based materials.
Protection to exposed edges of insulation: Reduced thickness treated timber batten (or equivalent plywood construction), a minimum width of 150 mm and 10 mm less in thickness than the insulation to accommodate the build-up of the waterproofing layers – all securely fixed to the deck.
Fixing method: Fasteners - type/length appropriate and suitable to particular deck substrate.
Fixing centres: 500 mm (max)
Timber trims: Outer edges chamfered at changes in level.
5.8.2 Metal hard edge
Material: Galvanised mild steel.
Thickness: Minimum 1 mm.
Dimensions: 50 mm x 50 mm.
Length: Maximum 3 m.
Preparation: Surface to be inspected and cleaned if necessary, using white spirit to remove any contaminants, dirt or dust & primed with the specified Bauder primer. Prepared material to be thoroughly dry before use.
Fixing method: Adhered using the specified Bauder primer.
Installation: The 50 x 50 mm galvanised mild steel angle to be adhered to the exposed leading edge of the insulation to retain the metal in position and prevent post-installation movement whilst the detail is waterproofed.
Metal hard edge and insulation facing to be primed prior to installation of the underlayer.