Primers
Specific primers are required to enhance adhesion of the AVCL or underlayer to the different prepared substrates.
Primer compatibility
| Substrate | Self-adhesive membrane KSA DUO, KSA DUO 35, KSD FBS, DS 1 DUO, Sprint DUO | Torch-on membranes Super AL-E, EVA 35, EGV 35 TF, G4E |
|---|---|---|
| Concrete New | SA Bonding Primer (Drum) - Black | SA Bonding Primer (Drum) - Black |
| Concrete Refurb | Activator-Primer (Canister) - Black | Activator-Primer (Canister) - Black |
| Plywood/OSB | Activator-Primer (Canister) - Black | Quick Dry Primer (Drum) - Black |
| Metal | Activator-Primer (Canister) - Black | Quick Dry Primer (Drum) - Black |
| In-situ Reinforced Bitumen Membranes | Activator-Primer (Canister) - Black | Not permitted |
| Asphalt | Quick Dry Primer (Drum) - Black | Not permitted |
| Cement Particle Board | Quick Dry Primer (Drum) - Black | Quick Dry Primer (Drum) - Black |
Important: All surfaces must be dry, clean, and free from dust, dirt, oil, grease, and loose material before application.
Never attempt torching within 10 mins of primer application, even if the surface appears dry.
Regularly clean spray nozzle tips with Bauder Spray Gun Nozzle Cleaner to ensure an even spray pattern is achieved. Not to be used on new or refurbishment concrete decks.
3.2 Activator-Primer (Canister) - Black
Application method: spray-applied.
Application temperature: should be between +5 to +30°C. Where the temperature falls outside of this, please refer to Summer and Winter advice documents from Bauder.
Application rate: 300 mm wide spray.
Coverage: Approx. 96 g/m² (up to 150m² per canister) - Two coats may be required for very porous substrates.
Drying time: Approx. 5 - 10 mins, dependent upon ambient temperature and material porosity.
Coats: Where additional coat required, fully bond to previous coat.
Re-application: Necessary after 4 hours exposure if waterproofing has not yet been applied, to maintain adhesion performance.
Quick dry primer onto refurb concrete deck
- Prepare the canister according to the set-up instructions.
- Use a test surface to ensure the canister spray system is working correctly and achieves an even spray pattern 300 mm wide.
- Protect any areas not requiring primer.
- Spray-apply an even coat of primer to achieve full coverage, avoiding over-spray or pooling.
- Remove any over-spray with Bauder spray gun nozzle cleaner.
- Allow the non-flammable solvent & propellant to evaporate from the primer for a minimum of 10 mins at 20° C.
- Continue with installation as described in Section 4.

3.3 Quick Dry Primer (Drum) - Black
Application method: brush or roller.
Application temperature: +5 to +25ºC.
Coverage: 100 to 200 m² per drum depending on porosity of substrate. Two coats may be required for very porous substrates.
Drying time: Approx. 3 - 6 hours, dependent upon ambient temperature and substrate porosity.
Coats: Where additional coat required, fully bond to previous coat. Allow volatiles to dry off thoroughly between coats.
Re-application: Necessary after 24 hours exposure if waterproofing has not yet been applied to maintain adhesion performance.
- Protect any areas not requiring primer.
- Apply a thin even coat directly onto the substrate with a roller or brush, ensuring a full coverage and avoid pooling.
- Absorb any spillage in inert material and shovel up - remove contaminated material to safe location for subsequent disposal.
- Replace lid when not in use.
- Allow the solvents to evaporate from the primer for at least 30 minutes. Drying time approx. 3-6 hours at 20ºC. Once fully dried it is safe to install membrane.
- Continue with installation as described in Section 4.


Application method: Brush or roller.
Application temperature: +5 to +30ºC.
Application rate: Timber/metal: approx. 200 g/m². Concrete/brickwork: approx. 200-300 g/m² depending upon roughness and porosity.
Coverage: Two coats may be required for very porous substrates.
Drying time: Approx. 30 mins, dependent upon ambient temperature and material porosity.
Coats: Where additional coat required, fully bond to previous coat. Allow volatiles to dry off thoroughly between coats.
Re-application: Necessary after 4 hours exposure if Bauder self-adhesive bitumen membrane has not yet been applied to maintain adhesion performance.
- Protect any areas not requiring primer.
- Apply an even coat directly onto the substrate with a roller or brush, ensuring a full coverage and avoid pooling.
- Methods for cleaning up: absorb in vermiculite, dry sand or earth and place into containers.
- Replace lid when not in use.
- Allow the solvents to evaporate from the primer for at least 30 minutes. Drying time approx. 30 mins at 20ºC. Once fully dried it is safe to install membrane.
- Continue with installation as described in Section 4.
Take necessary precautions to avoid the solvent vapour from entering the building’s ventilation system.
Tools and overspill can be cleaned in Bauder PMMA Cleaner.
Must be used on new and refurbishment concrete decks.


3.4 SA Bonding Primer (Drum) - Black
Application method: Brush or roller.
Application temperature: +5 to +30°C.
Application rate: Timber/metal: approx. 200 g/m².
Concrete/brickwork: approx. 200-300 g/m² depending upon roughness and porosity.
Coverage: Two coats may be required for very porous substrates.
Drying time: Approx. 30 mins, dependent upon ambient temperature and material porosity.
Coats: Where additional coat required, fully bond to previous coat. Allow volatiles to dry off thoroughly between coats.
Re-application: Necessary after 4 hours exposure if Bauder self-adhesive bitumen membrane has not yet been applied to maintain adhesion performance.
Take necessary precautions to avoid the solvent vapour from entering the building’s ventilation system.
Tools and overspill can be cleaned in Bauder PMMA Cleaner.
Must be used on new and refurbishment concrete decks.
- Protect any areas not requiring primer.
- Apply an even coat directly onto the substrate with a roller or brush, ensuring a full coverage and avoid pooling.
- Methods for cleaning up: absorb in vermiculite, dry sand or earth and place into containers.
- Replace lid when not in use.
- Allow the solvents to evaporate from the primer for at least 30 minutes. Drying time approx. 30 mins at 20ºC. Once fully dried it is safe to install membrane.
- Continue with installation as described in Section 4.