Air and Vapour Control Layer (AVCL)

4.1 General guidance for all AVCLs

AVCL Application

AVCLApplication
BauderTEC KSD FBSSelf-adhesive
BauderTHERM DS 1 DUOSelf-adhesive
Bauder Super AL-ETorch-applied
Bauder EVA 35Torch-applied







Page 16_3

Side and end laps: minimum 100 mm, laid with all laps heat sealed to provide a continuous bitumen bead extrusion. Installation methods as recommended by Bauder.

Exposed edges of insulation: (at roof perimeters, abutments, upstands, kerbs, outlets, penetrations): Enclose, with AVCL.

Upstands: dress the air and vapour control layer up all upstands and to the full extent of the detail to ensure the detail is fully encapsulated. This reduces the risk to exposed combustible materials and improves wind resistance.

Details: form all details in such a way that a fully bonded 100 mm lap is obtained between the AVCL and underlayer – refer to project detail drawings.

Metal decks: all side laps must be supported on the crowns of the metal deck.

Installation tips

  • Care should be taken to ensure adhesion when the temperature is below + 5ºC.
  • On cold days or when the deck is slightly damp – gently warming the deck area in front of the roll with a torch or hot air will improve the speed of the bonding application (torch to be used on non-combustible substrates only).
  • All details and penetrations need to be sealed according to Bauder’s instructions and CAD drawings for the roof to pass its inspections.
⚠️ Warning
Metal decks - To ensure side laps of the air and vapour control layer (AVCL) are fully supported, they will need to have the width cut to suit the profile of the deck or larger laps should be formed.

To support end laps, cut approximately 200 mm strip off the end of the AVCL roll and apply it taut across the troughs where the roll ends will meet.

Page 17_2

Page 17_3

4.2 Self-adhesives AVCLs

  • Lay out the membrane and align so that the membrane runs straight.
  • Roll back the membrane on the spindle to half the length of the roll and ensure it is wound tight onto the spindle.
  • Using the straight-bladed knife, carefully cut across the release film to the full width of the roll.
  • Pull the release film, so that the membrane unrolls onto the substrate.
  • Roll out applying pressure to ensure adhesion to the substrate. Any air pockets should be rolled over with the long handle lap roller to remove them.
  • Complete for the remaining half of the roll.
  • Heat seal the head laps ensuring a continuous bitumen bead extrusion is achieved.
  • Cut appropriately sized and shaped membrane pieces appropriate to the detail.
  • Press the membrane into/around the detail to ensure it will fit.
  • Carefully cut the release film halfway across the membrane piece.
  • Remove one half of the release film and press the adhesive side into the detail, consolidate with a hand roller. Heat seal the laps ensuring a bitumen extrusion is achieved.
  • Remove the remaining half of the release film and press the adhesive side into the detail, consolidate with a hand roller.
  • Heat seal the laps ensuring a bitumen extrusion is achieved.
⚠️ Warning

The side laps are to be 100 mm and must be laid with the fleece side laid on top of the thermofusible film side (red over blue for DS1) and sealed with appropriate heat sources according to NFRC Safe2Torch guidelines:

  • A hot air gun in flame-free zones.
  • Gas torch in torch-safe zones.

All laps are sealed to extrude a continuous bead of bitumen by hot air welding for flame-free zones and detailing or torching and rolling in torch-safe zones.

Installation in the field areas

DS 1 DUO installed to field area

DS 1 DUO installed to field area

AVCL taken to full extent of upstand

AVCL taken to full extent of upstand

4.2.1 TEC KSD FBS

Attachment: Cold applied and fully bonded to substrate in accordance with Bauder’s requirements and following Section 4.2

Head lap: 100 mm and staggered in a brickwork pattern.

Side laps: 100 mm and fleece side laid on top of the thermofusible film side.

TEC KSD FBS product image

4.2.2 DS 1 DUO

Attachment: Cold applied and fully bonded to substrate in accordance with Bauder’s requirements and following Section 4.2.

Head lap: 100 mm and staggered in a brickwork pattern.

Side laps: 100 mm and must be laid red over blue.

Tips: Use a straight bladed craft knife when cutting the peel off film on the back of the self-adhesive membranes.

⚠️ Warning

Important: If BauderTHERM DS 1 DUO is left exposed for longer than two weeks as a temporary waterproof layer, the burn off release foil and surface of the torch-activated adhesion strips will be affected by the exposure to ultra-violet. Please note that as a result, more heat will be required to activate the strips to enable sufficient adhesion with the insulation boards.

DS 1 DUO should not be used in flame-free zones as you cannot use a torch to activate the bitumen strips.

DS 1 DUO should not be used to bond PIR Tapered, PIR TA Tapered or BauderROCK by heat activating the strips, as this does not give a sufficient bond strength. The specified Bauder insulation adhesive should be used.

DS 1 DUO product image

4.3 Torch-on AVCLs for Safe2Torch areas zones

Bauder torch-on AVCL’s are generally required to be fully bonded to the deck substrate, however, for new concrete, it should be partially bonded to meet the requirements of the current codes of practice.

  • Lay out the membrane and align so that the membrane runs straight.
  • Roll back the membrane on the spindle to half the length of the roll and ensure it is wound tight onto the spindle.
  • Using the roll bar and spindle allows to partially bond with the torch directed towards the roll, therefore avoiding direct contact with the non-combustible deck/substrate.
  • The weight of the roll bar helps to evenly spread the bitumen flow across the roll. This will help to adjust and control the application speed of the membrane, achieving a neat, even, bitumen bead extrusion from all the lap joints.
  • Unsightly foot marks in the newly laid and still hot material can be avoided by walking backwards (where safe to do so) in front of the membrane, rather than walking directly on the membrane being applied.
⚠️ Warning

Important - MUST NOT be used in flame-free zones, only to be used in torch-safe zones. MUST NOT be torched directly onto any combustible decks/upstands.

Torch applied AVCL to field area

Torch applied AVCL to field area

4.4 Using an AVCL as temporary waterproofing

Membrane TypeMaximum length of time membrane can be left exposed
DS 1 DUO4 months (2 weeks for re-activating bitumen stripes)
EVA 354 months
KSD FBS & Super AL-E6 months
Bauder insists an inspection is carried out before installation of the next layer to ensure waterproofing integrity.

Temporary waterproofing installation